Archive for November, 2006

Restoration of a casa colonica.6

The vision evolves toward reality
Braccioli ( tiles ) salvaged from the original structure were placed over the new travi ( beams ) to create the underlayment for the new piano primo ( first floor ).  A 4 cm layer of concrete was placed over the braccioli and connected to the exterior stone walls with reinforcing rods to stabilize the [...]